This comprehensive five week contract involved the removal of the original kitchen, including units, flooring, tiles, appliances and their disposal.
Walls were prepared and the floor was tiled to include a tile skirting. Some plaster repair work to the walls was required. Wall and base units, including customised units, were installed along with worktop and appliances.
Electrics and plumbing were neatend up plus to include new dishwasher.Ventilation extraction system was improved with a hidden slimline option. 
Lighting was replacedĀ and finishing decor such as painting and woodwork completed.
Additional work was carried out in other rooms including laminate flooring throughout, skirting repairs, painting of bedrooms and hall, repair hall socket and other minor maintenance.